The WIP required for a line with no variability to achieve maximum throughput with minimum
cycle time.
Critical WIP = (Bottleneck Rate)(Raw Process Time)
The WIP required for a line with no variability to achieve maximum throughput with minimum
cycle time.
Critical WIP = (Bottleneck Rate)(Raw Process Time)