The time jobs spend waiting due to batching and is composed of Wait-to-Batch Time and Wait-in-Batch Time. Wait-to-Batch Time is the time jobs spend waiting to form a batch for either (simultaneous) processing or moving. Wait-in-Batch Time is the average time a part spends in a (process) batch waiting its turn on a machine.