Back to Glossary

Performance Factor

A measure of construction efficiency, which equals the planned productivity divided by the actual productivity. This ratio is sometimes called a PF value or a rate ratio. A ratio greater than 1.0 signifies better-than-planned performance.

© 2024 Project Production Institute. All Rights Reserved.