Pull systems establish an a priori limit on work in process. A pull system, which triggers releases of work based on the amount of work in the system, will not allow WIP to grow without bound. In projects, this is a fundamental control to prevent projects from blowing up on cost and missing schedules. Using Operations Science, the optimal amount of WIP for a project can be determined during design of the Project Production Management system.