Presentations

19 July 2023

Project Production Control Implementation to Improve Construction Schedules

Every key performance indicator used to monitor a project’s construction progress emphasizes trade productivity or specific commodity run-down curves. Examples include productivity of welding by quantity of joints completed per day, quantity of NDT (Non-Destructive Test) inspection per day, etc. By understanding that project production system is the collection of ...

19 July 2023

RPA for Estimating ER Releases

Robotic Process Automation (RPA) is a rapidly evolving technology that has been widely adopted in various industries for its ability to automate repetitive and rule-based tasks. In this paper, we present a case study of RPA implementation for Estimating Services within Saudi Aramco. The implementation of RPA has led to increased productivity, reduced processing t ...

19 July 2023

Lean Demystified: Operations Science Explains and Expands Lean

Using the basic principles of Operations Science, this paper seeks to reveal the secret, one that is hidden in plane sight, of the success of Lean. The list of seven, eight or even ten forms of waste are replaced by one malefactor, variability and the three buffers that will always be present to couple demand with transformation.

19 July 2023

Lean Methods in Nuclear Power

Nuclear power is returning to the energy agenda in Europe and elsewhere across the globe because of the challenges of Climate Change and a refreshed understanding of the need for energy security. Nuclear power has a cost problem which is largely driven by the high cost of construction and long build schedules. This paper addresses the key ways of making nuclear p ...

19 July 2023

Misconception of Kanban in Project Delivery due to Schedule-based Thinking

Kanban, a subsystem within the Toyota Production System, was popularized throughout the world alongside just-in-time (JIT), fool-proofing, heijunka, kaizen, andon, hoshin kanri, etc., as part of Lean Manufacturing approaches and techniques. Kanban’s simplicity, effectiveness, and robustness are well-understood by many. At the same time, it is probably one of the ...

19 July 2023

Product, Process, Resource – an Integrated Modeling Approach for Production Engineering and Industrialized Construction

The concurrent development of product designs and process designs, typically to achieve a balance of customer requirements, product functionality, and predictable buildability, is one effective technique in the pursuit of industrialized construction. Too many customer requirements and functions, and the product becomes difficult and unpredictable to deliver. Too ...

19 July 2023

Simulation Preemption of Construction Operations

Construction simulation models often need to interrupt activities in progress when events such as equipment breakdowns or differing soil conditions are encountered. The new functions and statements to support activity preemption directly in the STROBOSCOPE simulation system are described and illustrated by two examples. The first example involves moving soil usin ...

19 July 2023

Developing a Business Case to Productize

The future of capital project execution for the heavy industrial sector needs to look at innovative ways to improve productivity and project success, which includes the implementation of productization methods. The benefits of a productization strategy are not well known, however industrial productization is becoming more communicated within the industry as the f ...